Resources on Breakdown
Additional Resources can be required at an Activity during a breakdown when Detailed Efficiency is selected.
Set a repair Resource to be required by opening the efficiency dialog of an Activity. Select the Detailed Efficiency option and click the Time to Repair button. This opens the Length of Down Times dialog that allows additional Resources to be present during a repair time.