Set Resources Required For Repair

Sets the quantity of a Resource required to repair an Activity.

Parameters

  • Activity - Activity where the repair Resource requirement is to be set
  • Resource - Name of Resource to be used for repair
  • Quantity - Number of the Resource required during repair at the Activity.
  • Max Quantity - Max number of Resources that can be used (to reduce repair time).

Comments

In most cases the Maximum and Minimum parameters will be the same (For exceptions see Resource Details Dialog). The Resource must already be connected to the Activity. This command does not make new connections. 0 is a valid numbers (so that none of a particular Resource are required sometime).