Resource Requirements to Sheet

Stores an Activity’s Resource requirements to an Internal Spreadsheet.

Parameters

  • Activity- The Activity where Resources are assigned.
  • Internal Spreadsheet Resource – Spreadsheet to be populated with the Resource Requirements: Set [c,r] based on where you want requirements to be copied to.

Comments

The output of the Resource Requirements stored in the internal spreadsheet is a list of all the Resources assigned to this Activity, with the Maximum and Minimum requirements for each Resource.

Annotated Example

In the following example Resources requirements are stored in the ss_Resources internal spreadsheet. Resource 1 and Resource 2 are assigned to Activity 1, and the columns on the right present their Minimum and Maximum requirements.

Simul8 Resource Requirements to Sheet