Start Point Results
The results of a Start Point show:
- Number of Work Items arrived through this Start Point
- Number of Work Items lost over the time of the run, that is Simul8 tried to feed them into the simulation but there was no available object to receive them. So for example, the Start Point feeds an Activity and the Activity is already processing another Work Item.
- Number of Work Items that were actually passed into the simulation, that is the number that arrived minus the number that were lost
Overtime Results
If you have run the simulation with Overtime enabled, you will have additional overtime results available.